INSTRUCTION BOOK FOR UTB Contour
2Tools Required for InstallationIncluded HardwareLarge Wall Bracket (47”) (1) Screens under 104" in viewing width (2) Screens 104" and over
31. Create a clean work area for assembly using a soft clean material. This will protect the inner frame and ensure a clean projection surface.2. U
41. Position outer bezel pieces on all sides (Figure 3a). Gently lift and slide each outer bezel piece around the inner frame and viewing surface as
5Outer Bezel Assembly (continued) b. For screens 104” wide viewable and over, attach (2) frame brackets If your screen is 104" or over in viewin
61. Secure the large top wall bracket to wall studs at the desired height. Make sure the bracket is level. The top of the screen will be 2¼" ab
71. Secure the (2) large top wall bracket to wall studs at the desired height. Make sure the brackets are level. The top of the screen will be 2¼&qu
LIMITED ONE YEAR WARRANTY ON DA-LITE PRESENTATION PRODUCTSMilestone AV Technologies LLC warrants certain Da-Lite branded products to the original purc
Komentarze do niniejszej Instrukcji